Our team completed an electrical installation project of control and instrumentation works.

The overall project scope is the installation of cabling and electrical power distribution equipment associated with Fire Control System.

We supplied and installed 900 metres of 12” Galv cable trays, cables, glands, blanks junction boxes, distribution boards and connections to motorised valves. Installation of Fire Control Panel works involved in the high organization of material and plant to be delivered regularly to site via ferry and freight companies throughout the stages of projects and allowance of no shortages as high qualities of all materials and plant required and no way of collection on the island to facilitate the works to be carried out.

Latest News

View all

The Accreditations of a Good Electrical Contractor

June 2022

Certifications and qualifications serve as a good reflection of an electrical contractor’s experience and knowledge. A list of recognised accreditations should be on your list of criteria when looking to work with a potential new electrical contractor.

Read more Share Share on Twitter Share on LinkedIn

A Spotlight on Lighting Inspections

May 2022

Electrical safety should never be overlooked, especially in businesses and commercial properties that have hundreds of lights fitted.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

Header Point Lighting Rectification

July 2021

Our team carried out a rectification project on faulty header point light fittings in Lerwick.

Read more

Additional Replacement Light Fitting

July 2021

In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.

Read more

ISO 14001 ISO 9001 CHAS APEA ECA CompEx NICEIC Approved Contractor NICEIC Hazardous Achilles Alcumus Safe Contractor