Our team were required to help a site in Wales with their 2No temporary 1 Arm loading skids installation.

As part of the project, the team installed a tank gauging overfill alarm sounder/beacon, as well as an IHLA overfill alarm sounder/beacon. As well as this, we also installed their IHLA Control Panel, and Driver Display DISS 200 to maximise their efficiency and safety. Installation of their tank lighting switch VARS/1/ISO/001 was also conducted whilst the team were on-site for this project. 

We also ensured all alarms and emergency devices were installed and labelled correctly throughout the site, including an Emergency Stop Button VARS/1/ESD/001, and an Overspill Protection Device VARS/1/SCU/001. 

If you would like to find out more about how our friendly team of experts can help you enhance the safety of your hazardous area, call us on 01562 750804, or email us at info@srelectrical.com. In the meantime, view our hazardous area services by clicking here.

Latest News

View all

A Spotlight on Lighting Inspections

May 2022

Electrical safety should never be overlooked, especially in businesses and commercial properties that have hundreds of lights fitted.

Read more Share Share on Twitter Share on LinkedIn

The Importance Of Electrical Inspections In Hazardous Areas

March 2022

Electrical inspections are crucial in any zoned hazardous area, not only to ensure that operations are running safely but also to make sure the business remains compliant.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

Header Point Lighting Rectification

July 2021

Our team carried out a rectification project on faulty header point light fittings in Lerwick.

Read more

Additional Replacement Light Fitting

July 2021

In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.

Read more

ISO 14001 ISO 9001 CHAS APEA ECA CompEx NICEIC Approved Contractor NICEIC Hazardous Achilles