Our team were required to help a site in Wales with their 2No temporary 1 Arm loading skids installation.
As part of the project, the team installed a tank gauging overfill alarm sounder/beacon, as well as an IHLA overfill alarm sounder/beacon. As well as this, we also installed their IHLA Control Panel, and Driver Display DISS 200 to maximise their efficiency and safety. Installation of their tank lighting switch VARS/1/ISO/001 was also conducted whilst the team were on-site for this project.
We also ensured all alarms and emergency devices were installed and labelled correctly throughout the site, including an Emergency Stop Button VARS/1/ESD/001, and an Overspill Protection Device VARS/1/SCU/001.
If you would like to find out more about how our friendly team of experts can help you enhance the safety of your hazardous area, call us on 01562 750804, or email us at info@srelectrical.com. In the meantime, view our hazardous area services by clicking here.
Latest News
View all
SR Electricals 2025 Recap
As we approach the end of 2025, it feels like the right time to look back on a year of steady progress and meaningful developments for SR Electrical.
Hazardous Area Lighting: Essential for Safety This Winter
Poor visibility in classified zones doesn’t just affect productivity; it increases risk and can compromise safety standards across your facility.
Read more about Hazardous Area Lighting: Essential for Safety This Winter
Share
Latest Projects
View all
Hazardous Area Lighting For A Hydrogen Dispensing Area
We were contacted to supply and install zone 1 hazardous area lighting to our clients’ hydrogen dispensing area.
Read more about Hazardous Area Lighting For A Hydrogen Dispensing Area
Waste Management Plant Room ATEX Lighting
For a client with a waste management plant room, we supplied and installed zone 1 ATEX certified lighting as well as emergency lighting controls via ATEX certified motion sensor controllers.
