Installation of additional “Clean Earth” underfloor busbar trunking and additional floor boxes.
- We have supplied and installed 2 Nº additional 3.6m lengths of ‘Electrak’.
- A new 3c10mm² XLPE/SWA/PVC cable has been installed from Distribution Board to the 2 Nº lengths of busbar trunking.
- The existing 6 Nº floor boxes under desk row Nº 4, 5 and 6 has now had 9m flexible conduit leads fitted and plugged into the new ‘Electrak’ underfloor busbar trunking.
- We have supplied and installed 1 Nº additional floor box complete with 2 Nº twin 13A sockets in each floor box at the end desk of each row of desk Nº 4, 5 and 6 to cope with the additional staff with the growth of their business.
Latest News
View allThe Accreditations of a Good Electrical Contractor
Certifications and qualifications serve as a good reflection of an electrical contractor’s experience and knowledge. A list of recognised accreditations should be on your list of criteria when looking to work with a potential new electrical contractor.
Read more
Share
A Spotlight on Lighting Inspections
Electrical safety should never be overlooked, especially in businesses and commercial properties that have hundreds of lights fitted.
Read more
Share
Latest Projects
View allHeader Point Lighting Rectification
Our team carried out a rectification project on faulty header point light fittings in Lerwick.
Additional Replacement Light Fitting
In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.