Installation of additional “Clean Earth” underfloor busbar trunking and additional floor boxes

  • We have supplied and installed 2 Nº additional 3.6m lengths of ‘Electrak’.
  • A new 3c10mm² XLPE/SWA/PVC cable has been installed from Distribution Board to the 2 Nº lengths of busbar trunking.
  • The existing 6 Nº floor boxes under desk row Nº 4, 5 and 6 has now had 9m flexible conduit leads fitted and plugged into the new ‘Electrak’ underfloor busbar trunking.
  • We have supplied and installed 1 Nº additional floor box complete with 2 Nº twin 13A sockets in each floor box at the end desk of each row of desk Nº 4, 5 and 6 to cope with the additional staff with the growth of their business.

Latest News

View all
June 2019
Certas Energy has uploaded a video in regards to the opening of Ecclefechan depot in which SR Electrical was the electrical contractor for this project.
Continue reading this article
May 2019
SR Electrical Services Ltd Managing Director Steve Rugg welcoming our new electrician Rich Tromans to our team.
Continue reading this article
January 2019
Insider Media have written an article in regards to the opening of Holton Heath depot in which SR Electrical did take part on.
Continue reading this article

Get in touch

CIS
CHAS
APEA
ECA
CompEx
Trust Mark
NICEIC Approved Contractor
NICEIC Hazardous