Catch equipment failure and avoid breakdowns before they occur with a planned preventative maintenance (PPM) programme.

Our tailored programmes include scheduled inspections, general equipment repairs, specialist servicing and equipment upkeep to extend its lifespan and maintain optimal performance. 

By identifying and addressing any potential issues, your site can benefit from:

  • Cost Savings: Minimises the costs associated with emergency repairs and replacements.
  • Reduced Downtime: Maintain efficiency without unexpected breakdowns.
  • Enhanced Safety: Ensure your processes are safe and in line with hazard reduction.
  • Improve Compliance: Meet relevant regulations and avoid potential fines.

Each of our PPM programmes are tailored to your facility and equipment and can include general maintenance, proactive electrical maintenance and reactive maintenance.

General Maintenance

Benefit from yearly maintenance bespoke to your hazardous site. This varies from a continuous rolling programme to correcting or refurbishing electrical equipment and installations.

Proactive Electrical Maintenance

Get proactive with the maintenance of your plant and infrastructure with services that compile a full diagnostic evaluation to identify system failures before they happen. 

Reactive Maintenance

Receive immediate repairs for your broken down or failed equipment with varying levels of criticality depending on your particular equipment.

If you are interested in any of the above maintenance services and would like to find out more on how we can help support your business, speak to our team today for more details. 


Latest News

View all

The Importance of Regular DSEAR Assessments

November 2023

It’s common knowledge that following the Dangerous Substances and Explosive Atmospheres Regulations 2002 is an essential measure to protect your business from fire and explosion.

Read more Share Share on Twitter Share on LinkedIn

ATEX Inspections: The Ultimate Equipment Safety Measure

October 2023

Although they may seem like a ‘worst-case scenario’, workplace explosions are a risk sector-wide, and the possibility is apparent at any hazardous area with flammable gases, mists, vapours or combustible dusts present. For this reason, ATEX directives are in place.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

ATEX Lighting & Electrics Installation

October 2023

Recently, we were called in to help a business in the food manufacturing sector with new hazardous area electrics at their site.

Read more

Header Point Lighting Rectification

July 2021

Our team carried out a rectification project on faulty header point light fittings in Lerwick.

Read more

ISO9001, ISO14001, ISO45001 CHAS APEA ECA CompEx NICEIC Approved Contractor NICEIC Hazardous Achilles Alcumus Safe Contractor