Recent Projects

Hazardous Area Hazardous Area Services
Safe Area Safe Area Services
Bodmin

Bodmin Hazardous Area

Rectification of Hazardous Defects

Read more

Lochcarnan

Lochcarnan Safe Area

Office Distribution board Replacement

Read more

Sandwich

Sandwich Hazardous Area

Rectification Hazardous Defects

Read more

Ulverston

Ulverston Hazardous Area

Installation of Proposed Bottom Loading Skid

Read more

Warrington

Warrington Safe Area

Installation of additional “Clean Earth” underfloor busbar trunking and additional floor boxes

Read more

Ecclefechan

Ecclefechan Hazardous Area

GRP Mains Position

Read more

Yelland

Yelland Hazardous Area Safe Area

Fuel storage depot with offloading facilities and new bottom loading skid

Read more

Bodmin

Bodmin Hazardous Area Safe Area

Pre-1970's electrical installation when depot had a top loading gantry.

Read more

Wrexham

Wrexham Hazardous Area

Installation of a fuel tank farm independent high level alarm system, installation of a static earthing system, installation of external lighting system, refurbishing a 4 arm bottom loading skid.

Read more

Avonmouth

Avonmouth Hazardous Area

Rectification of code 1 and 2 defects from operational fuel bulk storage depot.

Read more

What our clients say

Can you pass on my thanks to Steve and the team for their great work at Peterborough recently, as I said to my boss at the time if all contractors were like SR Electrical Services Limited our life would be so much easier.

CERTAS ENERGY

We are delighted the work is now complete and appreciate the work that has been put in by the engineers and that the downtime was minimalised.

SCOTTISH FUELS

We had SR Electrical Services Limited in yesterday to fix our outside office lights – what a wonderful job. Thank you very much.

CPL PETROLEUM

Latest News

View all
January 2019
Insider Media have written an article in regards to the opening of Holton Heath depot in which SR Electrical did take part on.
Read more
December 2018
SR Electrical Services Ltd Director Chris Rugg welcoming our new apprentice Ben Fellows to our team.
Read more
December 2018
New distribution board set up ready for planned shut down on the weekend at bunkering site.
Read more

Get in touch

CIS
CHAS
APEA
ECA
CompEx
Trust Mark
NICEIC Approved Contractor
NICEIC Hazardous