We were called upon to complete the installation of hazardous area lighting at a hydrogen truck testing maintenance workshop.
This project was carried out to ensure future car manufacturers could operate safely in this area.
This project consisted of the following:
- Installation of zone 2 hazardous area lighting
To learn more about our services and how we can assist you, please contact our team.

Client:
Horbia Mira

Hazardous Areas:
Zone 2

Environment:
Automotive Workshop

Value:
£24,500
Latest News
View all
The Hidden Costs of Skipping Electrical Inspections in Hazardous Areas
When it comes to managing a facility with a hazardous area, it can be all too easy to delay inspections to save time or reduce short-term costs. However, this small postponement can lead to much greater long-term costs.
Read more about The Hidden Costs of Skipping Electrical Inspections in Hazardous Areas
Share

Hazardous Areas: The Role of Facility Management in Risk Prevention
Facility management professionals play a critical role in ensuring that hazardous areas within the properties they manage are properly maintained and compliant with relevant safety standards.
Read more about Hazardous Areas: The Role of Facility Management in Risk Prevention
Share
Latest Projects
View all
Hazardous Area Lighting For A Hydrogen Dispensing Area
We were contacted to supply and install zone 1 hazardous area lighting to our clients’ hydrogen dispensing area.
Read more about Hazardous Area Lighting For A Hydrogen Dispensing Area

Waste Management Plant Room ATEX Lighting
For a client with a waste management plant room, we supplied and installed zone 1 ATEX certified lighting as well as emergency lighting controls via ATEX certified motion sensor controllers.








