Pre-1970's electrical installation when depot had a top loading gantry.
A lot of equipment now redundant; electrical installation needed to comply BS7671 2015 Amendment 3 (IET Wiring Regulations). As this site is a fuel storage depot the existing TNCS Earthing System required replacing for a TT Earthing System.
- Stripped out all redundant panels
- Installed 2 Nº TP&N Distribution Boards
- Installed new 4-pole 160A 100mA time delayed RCD
- Installed new main earth bar & new earth electrodes
Latest News
View all
Hazardous Areas: The Role of Facility Management in Risk Prevention
Facility management professionals play a critical role in ensuring that hazardous areas within the properties they manage are properly maintained and compliant with relevant safety standards.
Read more about Hazardous Areas: The Role of Facility Management in Risk Prevention
Share

How To Reduce Downtime in Food and Beverage Production
In the competitive world of food and beverage manufacturing, minimising downtime is essential for maintaining productivity, ensuring product quality and maximising profitability. Unplanned equipment failures can result in significant financial losses.
Read more about How To Reduce Downtime in Food and Beverage Production
Share
Latest Projects
View all
Hazardous Area Lighting For A Hydrogen Dispensing Area
We were contacted to supply and install zone 1 hazardous area lighting to our clients’ hydrogen dispensing area.
Read more about Hazardous Area Lighting For A Hydrogen Dispensing Area

Waste Management Plant Room ATEX Lighting
For a client with a waste management plant room, we supplied and installed zone 1 ATEX certified lighting as well as emergency lighting controls via ATEX certified motion sensor controllers.








