Installation of additional “Clean Earth” underfloor busbar trunking and additional floor boxes.
- We have supplied and installed 2 Nº additional 3.6m lengths of ‘Electrak’.
- A new 3c10mm² XLPE/SWA/PVC cable has been installed from Distribution Board to the 2 Nº lengths of busbar trunking.
- The existing 6 Nº floor boxes under desk row Nº 4, 5 and 6 has now had 9m flexible conduit leads fitted and plugged into the new ‘Electrak’ underfloor busbar trunking.
- We have supplied and installed 1 Nº additional floor box complete with 2 Nº twin 13A sockets in each floor box at the end desk of each row of desk Nº 4, 5 and 6 to cope with the additional staff with the growth of their business.
Latest News
View all
Preventing Industrial Failures: HSE Review Lessons
Operational safety and asset integrity are critical to industrial longevity, especially in a company dealing with chemicals and highly hazardous environments, as emphasised in the HSE Annual Science Review 2026.
Read more about Preventing Industrial Failures: HSE Review Lessons
Share
Beyond the Wiring: A Practical Guide to Hazardous Area Mechanical...
While most businesses associate ATEX compliance with electrical systems, the updated guidance places a much sharper focus on the mechanical side of explosion protection.
Read more about Beyond the Wiring: A Practical Guide to Hazardous Area Mechanical Inspections
Share
Latest Projects
View all
Hazardous Area Lighting For A Hydrogen Dispensing Area
We were contacted to supply and install zone 1 hazardous area lighting to our clients’ hydrogen dispensing area.
Read more about Hazardous Area Lighting For A Hydrogen Dispensing Area
Waste Management Plant Room ATEX Lighting
For a client with a waste management plant room, we supplied and installed zone 1 ATEX certified lighting as well as emergency lighting controls via ATEX certified motion sensor controllers.