Purpose-built GRP Cubicles at various Locations around the UK
SR Electrical Services Ltd with Trident Engineering Consultants have designed and built various GRP cubicles for electrical switch rooms and control room for a multiply of projects. We have been given the task to speed site installations up and getting sites up to operation as soon as possible. All companies have design and built and electrical switch room which complied with Certas Energy UK Ltd existing site specification and colour choice.
OBJECTIVE: To allow a site new build project switch room allow to be delivered near the end of a project with all equipment installed and connected up to consists of tank gauging, mains distribution systems, ESD controls, bottom loading skid control panel, independent high-level alarm control system and TT earthing system involving little time to be spent on site.
Latest News
View allOut with the old, in with the new
2020 has been a strange year. Here SR Electrical Services LTD, we would like to say thank you to each and every one of our valued clients and dedicated team members for their continued support and hard work throughout the year. We are extremely grateful.
Read more
Share
Is my workplace at risk of a combustible dust explosion?
Discover how our team can help keep your workplace, teams, and visitors safe from combustible dust explosions.
Read more
Share
Latest Projects
View allTank Gauging Installation - Wales
Recently, the SR Electrical Services LTD team were required to make a journey to Wales in order to help a site with their 2No temporary 1 Arm loading skids installation.
Rectification Hazardous Area Electrical Defects
Electrical Inspection and Test of the Oil Lubricant control panels and electrical installation








