Purpose-built GRP Cubicles at various Locations around the UK

SR Electrical Services Ltd with Trident Engineering Consultants have designed and built various GRP cubicles for electrical switch rooms and control room for a multiply of projects. We have been given the task to speed site installations up and getting sites up to operation as soon as possible. All companies have design and built and electrical switch room which complied with Certas Energy UK Ltd existing site specification and colour choice.

OBJECTIVE: To allow a site new build project switch room allow to be delivered near the end of a project with all equipment installed and connected up to consists of tank gauging, mains distribution systems, ESD controls, bottom loading skid control panel, independent high-level alarm control system and TT earthing system involving little time to be spent on site.

Latest News

View all

Out with the old, in with the new

December 2020

2020 has been a strange year. Here SR Electrical Services LTD, we would like to say thank you to each and every one of our valued clients and dedicated team members for their continued support and hard work throughout the year. We are extremely grateful.

Read more Share Share on Twitter Share on LinkedIn

Is my workplace at risk of a combustible dust explosion?

November 2020

Discover how our team can help keep your workplace, teams, and visitors safe from combustible dust explosions.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

Tank Gauging Installation - Wales

October 2020

Recently, the SR Electrical Services LTD team were required to make a journey to Wales in order to help a site with their 2No temporary 1 Arm loading skids installation.

Read more

Rectification Hazardous Area Electrical Defects

July 2020

Electrical Inspection and Test of the Oil Lubricant control panels and electrical installation

Read more

CIS CHAS APEA ECA CompEx Trust Mark NICEIC Approved Contractor NICEIC Hazardous Achilles