Purpose-built GRP Cubicles at various Locations around the UK.

SR Electrical Services Ltd with Trident Engineering Consultants have designed and built various GRP cubicles for electrical switch rooms and control room for a multiply of projects. We have been given the task to speed site installations up and getting sites up to operation as soon as possible. All companies have design and built and electrical switch room which complied with Certas Energy UK Ltd existing site specification and colour choice.

Our objective was to allow a site new build project switch room allow to be delivered near the end of a project with all equipment installed and connected up to consists of tank gauging, mains distribution systems, ESD controls, bottom loading skid control panel, independent high-level alarm control system and TT earthing system involving little time to be spent on site.

Latest News

View all

4 Signs Your Business is due a Hazardous Area Electrical Inspection

February 2023

With the vast amount of directives and regulations surrounding hazardous areas, it can be easy to forget the importance of ensuring that the electrics within this area are safe.

Read more Share Share on Twitter Share on LinkedIn

The Essentials of Electrical Control Panels and Why You Need One

January 2023

You may be thinking, control panels, how would they benefit my business? Well, we can tell you that they are widely used in industrial, commercial, and residential applications and are essential for industrial automation.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

Header Point Lighting Rectification

July 2021

Our team carried out a rectification project on faulty header point light fittings in Lerwick.

Read more

Additional Replacement Light Fitting

July 2021

In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.

Read more