Purpose-built GRP Cubicles at various Locations around the UK.

SR Electrical Services Ltd with Trident Engineering Consultants have designed and built various GRP cubicles for electrical switch rooms and control room for a multiply of projects. We have been given the task to speed site installations up and getting sites up to operation as soon as possible. All companies have design and built and electrical switch room which complied with Certas Energy UK Ltd existing site specification and colour choice.

Our objective was to allow a site new build project switch room allow to be delivered near the end of a project with all equipment installed and connected up to consists of tank gauging, mains distribution systems, ESD controls, bottom loading skid control panel, independent high-level alarm control system and TT earthing system involving little time to be spent on site.

Latest News

View all

The Accreditations of a Good Electrical Contractor

June 2022

Certifications and qualifications serve as a good reflection of an electrical contractor’s experience and knowledge. A list of recognised accreditations should be on your list of criteria when looking to work with a potential new electrical contractor.

Read more Share Share on Twitter Share on LinkedIn

A Spotlight on Lighting Inspections

May 2022

Electrical safety should never be overlooked, especially in businesses and commercial properties that have hundreds of lights fitted.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

Header Point Lighting Rectification

July 2021

Our team carried out a rectification project on faulty header point light fittings in Lerwick.

Read more

Additional Replacement Light Fitting

July 2021

In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.

Read more

ISO 14001 ISO 9001 CHAS APEA ECA CompEx NICEIC Approved Contractor NICEIC Hazardous Achilles Alcumus Safe Contractor