SR Electrical Services LTD attended the Ulverston Depot due to a breakdown with the sites tank gauging system.

After further investigation, it was determined that the existing tank gauging system was obsolete; meaning we were unable to source replacement parts for the system. 

Due to this, our team designed and measured the existing tank to allow for probes to be made to the site's perisic tank's diameter size and product type. We have now installed 3 number Veeder Root Magflex Probes, and 3 number Mag1 probes onsite. We have also installed a new Veeder Root Approved blue IS cable tray. 

SR Electrical have supplied and installed a TLS450 PLUS unit onsite, with a remote DISS 200 unit for drivers' access and to provide off-loading facility checking for Bridger drivers. As well as these areas of work, we have also supplied and installed an overfill protection sounder / beacons in various locations onsite. 

Certas Energy have allowed SR Electrical Services to install our remote cloud monitoring equipment into the tank gauging system to allow for wet stock management and maintenance to be carried out when the site's gauge is in operation.

Latest News

View all

How To Ensure Your Hazardous Area Electrics Are Safe

September 2022

Hazardous areas are present in various businesses with important operations requiring or creating hazardous substances. The risks surrounding electrics in these areas cannot be ignored and workplaces have an obligation to keep their employees safe and their site compliant.

Read more Share Share on Twitter Share on LinkedIn

ATEX Requirements: Keep Your Business Compliant

August 2022

In our previous news article, we shared the importance of ATEX awareness and how to identify an ATEX zone using HSE classifications. Once a zone where a possible explosive atmosphere has been identified, there are several essential requirements a business must apply.

Read more Share Share on Twitter Share on LinkedIn

Latest Projects

View all

Header Point Lighting Rectification

July 2021

Our team carried out a rectification project on faulty header point light fittings in Lerwick.

Read more

Additional Replacement Light Fitting

July 2021

In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.

Read more

ISO 14001 ISO 9001 CHAS APEA ECA CompEx NICEIC Approved Contractor NICEIC Hazardous Achilles Alcumus Safe Contractor