Our team supplied and installed a brand new, compliant distribution board in Cannock.
Firstly, we investigated the constant tripping of electrics on site at our clients in Cannock. Upon carrying out our investigations, we identified that the site had a common 30mA RCD in mains distribution board which did not comply and was causing intermittent power outage/nuisance tripping when an increase of current passed through the site, i.e. when 3 or 4 pumps were running simultaneously.
We were asked to provide a solution which would resolve the issue for our client and prevent unnecessary disruptions to site.
So from this, we supplied and installed a compliant distribution board complete with individual 30mA RCD protection and double pole isolation to tank dispensers, control systems and local dispenser lighting. This has rectified the issue and the client is happy to now be running back at full capacity.
Latest News
View all
SR Electricals 2025 Recap
As we approach the end of 2025, it feels like the right time to look back on a year of steady progress and meaningful developments for SR Electrical.
Hazardous Area Lighting: Essential for Safety This Winter
Poor visibility in classified zones doesn’t just affect productivity; it increases risk and can compromise safety standards across your facility.
Read more about Hazardous Area Lighting: Essential for Safety This Winter
Share
Latest Projects
View all
Hazardous Area Lighting For A Hydrogen Dispensing Area
We were contacted to supply and install zone 1 hazardous area lighting to our clients’ hydrogen dispensing area.
Read more about Hazardous Area Lighting For A Hydrogen Dispensing Area
Waste Management Plant Room ATEX Lighting
For a client with a waste management plant room, we supplied and installed zone 1 ATEX certified lighting as well as emergency lighting controls via ATEX certified motion sensor controllers.
