New mains GRP cubicle installation at Ecclefechan ready for proposed new HGV Bunkering site.
We have supplied and installed 1 Nº VR14 GRP grey enclosure 2m x 1m x 2m high. From this, we have allowed the following equipment to supplied and installed inside GRP cubical enclosure: -
- 4-pole RCD 100A, 300mA time delayed device and enclosure.
- TT Earthing System Earth Bar.
- 1 Nº Earth Electrode - attachment to mains position.
- 1 Nº 10-way S.P&N DB - to supply local lighting and power supplies in GRP cubicle.
- 1 Nº Tubular Heater - for local heating in GRP cubicle.
- 1 Nº 13A Single Socket.
- 1Nº 15 watt LED Emergency Light Fitting complete with Local Light Switch and Test Switch Facility.
Latest News
View allThe Accreditations of a Good Electrical Contractor
Certifications and qualifications serve as a good reflection of an electrical contractor’s experience and knowledge. A list of recognised accreditations should be on your list of criteria when looking to work with a potential new electrical contractor.
Read more
Share
A Spotlight on Lighting Inspections
Electrical safety should never be overlooked, especially in businesses and commercial properties that have hundreds of lights fitted.
Read more
Share
Latest Projects
View allHeader Point Lighting Rectification
Our team carried out a rectification project on faulty header point light fittings in Lerwick.
Additional Replacement Light Fitting
In December 2020, our team undertook rectification of a hazardous area light fitting in Northiam.