New mains GRP cubicle installation at Ecclefechan ready for proposed new HGV Bunkering site.
We have supplied and installed 1 Nº VR14 GRP grey enclosure 2m x 1m x 2m high. From this, we have allowed the following equipment to supplied and installed inside GRP cubical enclosure: -
- 4-pole RCD 100A, 300mA time delayed device and enclosure.
- TT Earthing System Earth Bar.
- 1 Nº Earth Electrode - attachment to mains position.
- 1 Nº 10-way S.P&N DB - to supply local lighting and power supplies in GRP cubicle.
- 1 Nº Tubular Heater - for local heating in GRP cubicle.
- 1 Nº 13A Single Socket.
- 1Nº 15 watt LED Emergency Light Fitting complete with Local Light Switch and Test Switch Facility.
Latest News
View all
SR Electricals 2025 Recap
As we approach the end of 2025, it feels like the right time to look back on a year of steady progress and meaningful developments for SR Electrical.
Hazardous Area Lighting: Essential for Safety This Winter
Poor visibility in classified zones doesn’t just affect productivity; it increases risk and can compromise safety standards across your facility.
Read more about Hazardous Area Lighting: Essential for Safety This Winter
Share
Latest Projects
View all
Hazardous Area Lighting For A Hydrogen Dispensing Area
We were contacted to supply and install zone 1 hazardous area lighting to our clients’ hydrogen dispensing area.
Read more about Hazardous Area Lighting For A Hydrogen Dispensing Area
Waste Management Plant Room ATEX Lighting
For a client with a waste management plant room, we supplied and installed zone 1 ATEX certified lighting as well as emergency lighting controls via ATEX certified motion sensor controllers.
